Commit Graph

3 Commits

Author SHA1 Message Date
Hartmut 47e4d701ff chore(repo): checkpoint current capakraken implementation state 2026-03-29 12:47:12 +02:00
Hartmut cd78f72f33 chore: full technical rename planarchy → capakraken
Complete rename of all technical identifiers across the codebase:

Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports

Import statements: 277 files, 548 occurrences replaced

Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI

CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated

Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated

Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*

Documentation: 30+ .md files updated

Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-27 13:18:09 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00