Commit Graph

11 Commits

Author SHA1 Message Date
Hartmut 1d02afddfd ci(e2e): add Playwright smoke tests to deploy-test workflow
Completes Epic #37 remaining scope:
- playwright.ci.config.ts — targets localhost:3100 (already-running Docker
  app), testMatch restricted to smoke.spec.ts, HTML report on failure
- e2e/smoke.spec.ts — 5 tests: health endpoint, unauth redirect, signin
  page render, admin login redirect, app shell nav visible
- deploy-test.yml — seed admin user via docker exec, setup Node 20, install
  Playwright 1.49 + Chromium, run smoke tests, upload report artifact on failure

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-04-02 23:25:12 +02:00
Hartmut 41eb722369 feat: user invite flow, deactivate/delete, favicon, dashboard loading fix, admin full-width
- Invite flow: admin can invite users by email with role selection; accept-invite page
  sets password and creates the account; 72-hour token expiry; E2E tests
- User deactivate/reactivate/delete: new tRPC procedures + UI buttons; deactivation
  revokes all active sessions immediately; delete cascades vacation/broadcast records;
  isActive field added via migration 20260402000000_user_isactive
- Auth: block login for inactive users with audit entry
- Favicon: SVG favicon + ICO/PNG fallbacks (16, 32, 180, 192, 512px); manifest updated
- Dashboard: GridLayout dynamic-import loading skeleton prevents blank dark area
  on first login before react-grid-layout chunk is cached
- Admin users: remove max-w-5xl constraint so table uses full page width
- Dev: docker container restart workflow documented in LEARNINGS.md; Prisma generate
  must run inside the container after schema changes (named node_modules volume)

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-04-02 20:19:26 +02:00
Hartmut b2568a3cb4 test(repo): cover worktree hygiene guardrails 2026-04-01 09:02:37 +02:00
Hartmut 60681eded7 ci(api): run assistant split regression 2026-04-01 00:52:31 +02:00
Hartmut 0b192efdb1 chore(ci): add workspace and db guardrails 2026-03-31 22:36:12 +02:00
Hartmut 7bcc831b5c refactor(ops): standardize image-based production delivery 2026-03-30 23:35:29 +02:00
Hartmut 819345acfa feat(platform): harden access scoping and delivery baseline 2026-03-30 00:27:31 +02:00
Hartmut 4f48afe7b4 feat(planning): ship holiday-aware planning and assistant upgrades 2026-03-28 22:49:28 +01:00
Hartmut cd78f72f33 chore: full technical rename planarchy → capakraken
Complete rename of all technical identifiers across the codebase:

Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports

Import statements: 277 files, 548 occurrences replaced

Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI

CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated

Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated

Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*

Documentation: 30+ .md files updated

Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-27 13:18:09 +01:00
Hartmut 6e5b9ec85b feat: Sprint 2 — test coverage, Dependabot, coverage gates, E2E expansion
API Router Integration Tests (43 new tests):
- dashboard-router.test.ts: 11 tests (all 5 queries + RBAC)
- project-router.test.ts: 17 tests (full CRUD + batch ops + RBAC)
- resource-router-crud.test.ts: 15 tests (CRUD + hover card + skill import)
- Fix: mock budget-alerts + cache in existing allocation/timeline tests

E2E Test Suite Expansion (29 new tests, 7 spec files):
- dashboard.spec.ts: widget grid, stat cards, add widget modal
- allocations.spec.ts: list, create modal, filters, column toggle
- estimates.spec.ts: list, wizard steps, navigation
- vacations.spec.ts: self-service, management, team calendar
- staffing.spec.ts: search, suggestions, skill tags
- admin.spec.ts: settings, users, roles, blueprints
- navigation.spec.ts: nav links, sidebar collapse, theme, mobile menu

Coverage Gates:
- api package: 80% lines, 75% branches
- application package: 80% lines, 75% branches (new vitest.config.ts)
- shared package: 70% lines, 65% branches
- CI updated to run per-package vitest --coverage

Dependabot:
- Weekly npm dependency checks with grouped minor+patch
- GitHub Actions version checks
- 10 PR limit for npm, 5 for Actions

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 21:29:58 +01:00
Hartmut 0d78fe1770 feat: Sprint 0 — CI/CD pipeline, production Docker, health checks
CI Pipeline (.github/workflows/ci.yml):
- 5 jobs: typecheck, lint, test, build, e2e (parallel where possible)
- PostgreSQL 16 + Redis 7 service containers for test/e2e
- pnpm store, Turborepo, Playwright browser caching
- Concurrency groups cancel in-progress runs

Production Docker:
- Dockerfile.prod: 3-stage build (deps → build → runtime ~150MB)
- docker-compose.prod.yml: postgres + redis + app with health checks
- .dockerignore for fast builds
- next.config.ts: output: "standalone" for minimal runtime

Health Check Endpoints:
- GET /api/health — liveness probe (200 OK, no deps)
- GET /api/ready — readiness probe (postgres + redis connectivity)

Documentation:
- docs/ci-cd-manual.md — full pipeline manual with troubleshooting
- plan.md — Product Owner strategic plan (bottlenecks, growth, automation)

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 20:33:18 +01:00