Commit Graph

9 Commits

Author SHA1 Message Date
Hartmut 4f48afe7b4 feat(planning): ship holiday-aware planning and assistant upgrades 2026-03-28 22:49:28 +01:00
Hartmut 3c0befb7db feat: enhanced timeline hover tooltip with role, dates, status
The tooltip shown when hovering over project strips in the timeline
now includes additional information:
- Role name (e.g. "3D Artist", "Project Manager")
- Assignment date range (2026-03-01 → 2026-06-30)
- Status badge when not CONFIRMED (shows PROPOSED, DRAFT, etc.)
- Lead person and order type on the same line

Data comes from already-loaded timeline entries — no extra API calls.
Safe change: tooltip is pointer-events-none and read-only.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-23 07:30:08 +01:00
Hartmut a97597093f feat: Sprint 2 — data storytelling and visual richness
Timeline project color system:
- 16-color deterministic palette (same project = same color always)
- Resource panel: allocation blocks colored by project instead of uniform green
- Project panel: colored left border + dot on project headers
- ProjectColorLegend: floating strip showing color-to-project mapping
- Utilization intensity tint: subtle background gradient on resource rows

Table visual enhancements:
- Resources: inline 3px utilization bar below chargeability percentage
- Resources: 32px avatar circles with initials + role-derived colors
- Projects: animated budget bars, styled resource count badges
- Allocations: 3px left border colored by status (green/amber/blue/gray/red)

KPI progress rings:
- Budget utilization: ProgressRing wrapping AnimatedNumber on dashboard
- Chargeability report: ring on average chargeability summary card
- Resource detail: rings on chargeability target + actual metrics
- Vacation balance: ring showing remaining days with color thresholds
- Demand widget: mini rings on FTE fill rate per project
- Resource detail: FadeIn on SkillRadarChart

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 00:58:06 +01:00
Hartmut e7b74f13bd refactor: consolidate duplicated code across web and API packages
- Extract shared render helpers (vacation blocks, range overlay, overbooking blink) into renderHelpers.tsx
- Centralize status badge styles and vacation color maps into status-styles.ts
- Extract dragMath.ts utility from useTimelineDrag for reuse
- Split useInvalidatePlanningViews into useInvalidateTimeline (4 queries) + useInvalidatePlanningViews (8 queries)
- Adopt findUniqueOrThrow() and Prisma select constants across API routers
- Add shared fmtEur() helper for API-side money formatting
- Wrap TimelineResourcePanel and TimelineProjectPanel with React.memo
- Fix pre-existing TS2589 deep type errors in TeamCalendar and VacationModal
- 38 files changed, reducing ~400 lines of duplicated code

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 00:10:08 +01:00
Hartmut ddec3a927a feat: timeline multi-select, demand popover, resource hover card, merged tooltips, dark mode fixes
Major timeline enhancements:
- Right-click drag multi-selection with floating action bar (batch delete/assign)
- DemandPopover for demand strip details (replaces broken "Loading" modal)
- ResourceHoverCard on name hover showing skills, rates, role, chapter
- Merged heatmap+vacation tooltips into unified TimelineTooltip component
- Fixed overbooking blink animation (date normalization, z-index ordering)
- Fixed dark mode sticky column bleed-through in project view
- System roles admin page, notification task management, performance review docs

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-18 23:43:51 +01:00
Hartmut eb283147d1 feat: project colors, timeline filters, sidebar fix, GitLooper agent, and misc improvements
- Fix sidebar double-highlight on /vacations/my (Gitea #6): add isNavItemActive() helper
- Add project color picker (schema + API + modal + timeline rendering)
- Add ProjectCombobox/ResourceCombobox to timeline toolbar
- Show PENDING vacations on timeline with dashed/dimmed style
- Add "show demand projects" preference with localStorage persistence
- Add ProjectAssignmentsTable with total hours/cost columns
- Extend vacation API to accept status arrays
- Add GitLooper formal YAML agent configuration
- Extend user admin with permission overrides UI
- Add delete-assignment use case tests
- Add status-styles.ts shared badge constants
- Centralize formatMoney/formatCents in format.ts

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-17 10:22:52 +01:00
Hartmut b0e55786c3 feat: AI assistant (HartBOT), demand filling, budget-per-role, project favorites, and UX improvements
AI Assistant (HartBOT):
- Chat panel with inline layout, session persistence, message history (up-arrow recall)
- OpenAI function calling with 20+ tools (search, navigate, create/cancel allocations, update status)
- RBAC-aware tool filtering, fuzzy search with word-level matching
- Navigation actions (router.push) and data invalidation after mutations
- Country/metro city/org unit/role filtering on resource search

Demand Filling Enhancements:
- Two-phase fill modal: plan multiple resources, then confirm & assign all at once
- Availability preview per resource (available/partial/conflict days, existing bookings)
- Coverage bar showing demand hours distribution across assigned resources
- Fill demand from project detail page (new Assign button per demand)
- Fixed: filled demands no longer shown on timeline, demand bars no longer overlap

Budget per Role:
- DemandRequirement.budgetCents field (schema + API + UI)
- Project wizard step 3: budget input per role with allocation summary bar
- Project detail: allocated vs booked budget per demand
- Fill demand modal: role budget display with cost estimates
- AllocationModal: budget field for demand editing

Project Favorites:
- User.favoriteProjectIds (JSONB) with toggle API
- Star button on projects list and detail page (optimistic updates)
- "My Projects" dashboard widget (favorites + responsible person projects)

Project Management:
- Edit project from detail page (ProjectModal integration)
- Edit demands from detail page (AllocationModal integration)
- Admin-only project deletion (cascades assignments + demands)
- Create user accounts from admin panel

Timeline Fixes:
- Country multi-select filter with backend support
- URL param sync for same-page navigation (AI assistant integration)
- Demand lane stacking (no more overlapping bars)
- Single-day booking resize handles (always visible, min 6px)
- Single-day resize allowed (start === end)
- "All Clients" toggle (select all / deselect all)

Other Fixes:
- crypto.randomUUID fallback for non-secure contexts
- Chat message limit raised (200 max, client sends last 40)
- Status dropdown portal (no longer clipped by table overflow)
- Cents display restored in budget views (2 decimal places)
- Allocations grouped view with project sub-groups (collapsed by default)
- Server-side resource search for project wizard (no 500 limit)

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-16 15:31:48 +01:00
Hartmut a83edb2f9d feat: timeline UI overhaul with project/resource panel redesign, quick filters, and API improvements
Redesigned timeline project and resource panels with expanded detail views,
added quick filter toolbar, improved drag handling, and enhanced vacation/entitlement
router logic. Includes e2e test updates and minor API fixes.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:28:59 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00