Commit Graph

462 Commits

Author SHA1 Message Date
Hartmut 2a9a400cd4 fix: rewrite combobox components to inline-input pattern with dark mode (Gitea #12)
Replace button+dropdown pattern with single input that becomes editable on focus.
Fixes "second bar appearing" UX bug, adds dark mode, fixes z-index overlap.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-17 10:29:12 +01:00
Hartmut eb283147d1 feat: project colors, timeline filters, sidebar fix, GitLooper agent, and misc improvements
- Fix sidebar double-highlight on /vacations/my (Gitea #6): add isNavItemActive() helper
- Add project color picker (schema + API + modal + timeline rendering)
- Add ProjectCombobox/ResourceCombobox to timeline toolbar
- Show PENDING vacations on timeline with dashed/dimmed style
- Add "show demand projects" preference with localStorage persistence
- Add ProjectAssignmentsTable with total hours/cost columns
- Extend vacation API to accept status arrays
- Add GitLooper formal YAML agent configuration
- Extend user admin with permission overrides UI
- Add delete-assignment use case tests
- Add status-styles.ts shared badge constants
- Centralize formatMoney/formatCents in format.ts

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-17 10:22:52 +01:00
Hartmut b0e55786c3 feat: AI assistant (HartBOT), demand filling, budget-per-role, project favorites, and UX improvements
AI Assistant (HartBOT):
- Chat panel with inline layout, session persistence, message history (up-arrow recall)
- OpenAI function calling with 20+ tools (search, navigate, create/cancel allocations, update status)
- RBAC-aware tool filtering, fuzzy search with word-level matching
- Navigation actions (router.push) and data invalidation after mutations
- Country/metro city/org unit/role filtering on resource search

Demand Filling Enhancements:
- Two-phase fill modal: plan multiple resources, then confirm & assign all at once
- Availability preview per resource (available/partial/conflict days, existing bookings)
- Coverage bar showing demand hours distribution across assigned resources
- Fill demand from project detail page (new Assign button per demand)
- Fixed: filled demands no longer shown on timeline, demand bars no longer overlap

Budget per Role:
- DemandRequirement.budgetCents field (schema + API + UI)
- Project wizard step 3: budget input per role with allocation summary bar
- Project detail: allocated vs booked budget per demand
- Fill demand modal: role budget display with cost estimates
- AllocationModal: budget field for demand editing

Project Favorites:
- User.favoriteProjectIds (JSONB) with toggle API
- Star button on projects list and detail page (optimistic updates)
- "My Projects" dashboard widget (favorites + responsible person projects)

Project Management:
- Edit project from detail page (ProjectModal integration)
- Edit demands from detail page (AllocationModal integration)
- Admin-only project deletion (cascades assignments + demands)
- Create user accounts from admin panel

Timeline Fixes:
- Country multi-select filter with backend support
- URL param sync for same-page navigation (AI assistant integration)
- Demand lane stacking (no more overlapping bars)
- Single-day booking resize handles (always visible, min 6px)
- Single-day resize allowed (start === end)
- "All Clients" toggle (select all / deselect all)

Other Fixes:
- crypto.randomUUID fallback for non-secure contexts
- Chat message limit raised (200 max, client sends last 40)
- Status dropdown portal (no longer clipped by table overflow)
- Cents display restored in budget views (2 decimal places)
- Allocations grouped view with project sub-groups (collapsed by default)
- Server-side resource search for project wizard (no 500 limit)

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-16 15:31:48 +01:00
Hartmut f5551e33c7 docs: add security audit, calculation reference, and review report
Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:29:19 +01:00
Hartmut 368fd6d7ad feat: calculation rules engine for decoupled cost attribution and chargeability
Introduces an admin-configurable rules engine that determines per-day cost
attribution (CHARGE/ZERO/REDUCE) and chargeability reporting (COUNT/SKIP)
for absence types (sick, vacation, public holiday). Includes shared types,
Zod schemas, Prisma model, rule matching with specificity scoring, default
rules, calculator integration, CRUD API router, seed data, chargeability
report integration, and admin UI.

283/283 engine tests, 209/209 API tests, 0 TS errors.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:29:12 +01:00
Hartmut a83edb2f9d feat: timeline UI overhaul with project/resource panel redesign, quick filters, and API improvements
Redesigned timeline project and resource panels with expanded detail views,
added quick filter toolbar, improved drag handling, and enhanced vacation/entitlement
router logic. Includes e2e test updates and minor API fixes.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:28:59 +01:00
Hartmut fa2019f521 fix: replace non-standard Tailwind opacity modifiers in globals.css
Tailwind v4 only accepts opacity values that are multiples of 5.
Changed /92→/90, /88→/90, /94→/95 to fix build errors.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 00:16:51 +01:00
Hartmut 625a842d89 feat: dashboard overhaul, chargeability reports, dispo import enhancements, UI polish
Dashboard: expanded chargeability widget, resource/project table widgets
with sorting and filters, stat cards with formatMoney integration.

Chargeability: new report client with filtering, chargeability-bookings
use case, updated dashboard overview logic.

Dispo import: TBD project handling, parse-dispo-matrix improvements,
stage-dispo-projects resource value scores, new tests.

Estimates: CommercialTermsEditor component, commercial-terms engine
module, expanded estimate schemas and types.

UI: AppShell navigation updates, timeline filter/toolbar enhancements,
role management improvements, signin page redesign, Tailwind/globals
polish, SystemSettings SMTP section, anonymization support.

Tests: new router tests (anonymization, chargeability, effort-rule,
entitlement, estimate, experience-multiplier, notification, resource,
staffing, vacation).

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:29:07 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00
Hartmut 4dabb9d4ce feat(application): complete dispo import operator flow 2026-03-14 15:14:55 +01:00
Hartmut 6a2f552ccb feat(application): add dispo import commit flow 2026-03-14 14:45:30 +01:00
Hartmut dd55d0e78b chore(repo): initialize planarchy workspace 2026-03-14 14:31:09 +01:00