Commit Graph

4 Commits

Author SHA1 Message Date
Hartmut 1df208dbcc feat(timeline): add pulse animation for in-flight drag mutations
Allocation bars that have active optimistic overrides (post-drag,
awaiting server confirmation) now pulse subtly via animate-pulse.
The pending set is derived from the existing optimisticAllocations
map keys, requiring no additional state.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-09 13:28:46 +02:00
Hartmut eb283147d1 feat: project colors, timeline filters, sidebar fix, GitLooper agent, and misc improvements
- Fix sidebar double-highlight on /vacations/my (Gitea #6): add isNavItemActive() helper
- Add project color picker (schema + API + modal + timeline rendering)
- Add ProjectCombobox/ResourceCombobox to timeline toolbar
- Show PENDING vacations on timeline with dashed/dimmed style
- Add "show demand projects" preference with localStorage persistence
- Add ProjectAssignmentsTable with total hours/cost columns
- Extend vacation API to accept status arrays
- Add GitLooper formal YAML agent configuration
- Extend user admin with permission overrides UI
- Add delete-assignment use case tests
- Add status-styles.ts shared badge constants
- Centralize formatMoney/formatCents in format.ts

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-17 10:22:52 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00
Hartmut dd55d0e78b chore(repo): initialize planarchy workspace 2026-03-14 14:31:09 +01:00