Commit Graph

10 Commits

Author SHA1 Message Date
Hartmut 819345acfa feat(platform): harden access scoping and delivery baseline 2026-03-30 00:27:31 +02:00
Hartmut 47e4d701ff chore(repo): checkpoint current capakraken implementation state 2026-03-29 12:47:12 +02:00
Hartmut beae1a5d6e feat(assistant): add approval inbox and e2e hardening 2026-03-29 10:10:59 +02:00
Hartmut 4f48afe7b4 feat(planning): ship holiday-aware planning and assistant upgrades 2026-03-28 22:49:28 +01:00
Hartmut cd78f72f33 chore: full technical rename planarchy → capakraken
Complete rename of all technical identifiers across the codebase:

Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports

Import statements: 277 files, 548 occurrences replaced

Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI

CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated

Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated

Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*

Documentation: 30+ .md files updated

Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-27 13:18:09 +01:00
Hartmut ddec3a927a feat: timeline multi-select, demand popover, resource hover card, merged tooltips, dark mode fixes
Major timeline enhancements:
- Right-click drag multi-selection with floating action bar (batch delete/assign)
- DemandPopover for demand strip details (replaces broken "Loading" modal)
- ResourceHoverCard on name hover showing skills, rates, role, chapter
- Merged heatmap+vacation tooltips into unified TimelineTooltip component
- Fixed overbooking blink animation (date normalization, z-index ordering)
- Fixed dark mode sticky column bleed-through in project view
- System roles admin page, notification task management, performance review docs

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-18 23:43:51 +01:00
Hartmut eb283147d1 feat: project colors, timeline filters, sidebar fix, GitLooper agent, and misc improvements
- Fix sidebar double-highlight on /vacations/my (Gitea #6): add isNavItemActive() helper
- Add project color picker (schema + API + modal + timeline rendering)
- Add ProjectCombobox/ResourceCombobox to timeline toolbar
- Show PENDING vacations on timeline with dashed/dimmed style
- Add "show demand projects" preference with localStorage persistence
- Add ProjectAssignmentsTable with total hours/cost columns
- Extend vacation API to accept status arrays
- Add GitLooper formal YAML agent configuration
- Extend user admin with permission overrides UI
- Add delete-assignment use case tests
- Add status-styles.ts shared badge constants
- Centralize formatMoney/formatCents in format.ts

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-17 10:22:52 +01:00
Hartmut b0e55786c3 feat: AI assistant (HartBOT), demand filling, budget-per-role, project favorites, and UX improvements
AI Assistant (HartBOT):
- Chat panel with inline layout, session persistence, message history (up-arrow recall)
- OpenAI function calling with 20+ tools (search, navigate, create/cancel allocations, update status)
- RBAC-aware tool filtering, fuzzy search with word-level matching
- Navigation actions (router.push) and data invalidation after mutations
- Country/metro city/org unit/role filtering on resource search

Demand Filling Enhancements:
- Two-phase fill modal: plan multiple resources, then confirm & assign all at once
- Availability preview per resource (available/partial/conflict days, existing bookings)
- Coverage bar showing demand hours distribution across assigned resources
- Fill demand from project detail page (new Assign button per demand)
- Fixed: filled demands no longer shown on timeline, demand bars no longer overlap

Budget per Role:
- DemandRequirement.budgetCents field (schema + API + UI)
- Project wizard step 3: budget input per role with allocation summary bar
- Project detail: allocated vs booked budget per demand
- Fill demand modal: role budget display with cost estimates
- AllocationModal: budget field for demand editing

Project Favorites:
- User.favoriteProjectIds (JSONB) with toggle API
- Star button on projects list and detail page (optimistic updates)
- "My Projects" dashboard widget (favorites + responsible person projects)

Project Management:
- Edit project from detail page (ProjectModal integration)
- Edit demands from detail page (AllocationModal integration)
- Admin-only project deletion (cascades assignments + demands)
- Create user accounts from admin panel

Timeline Fixes:
- Country multi-select filter with backend support
- URL param sync for same-page navigation (AI assistant integration)
- Demand lane stacking (no more overlapping bars)
- Single-day booking resize handles (always visible, min 6px)
- Single-day resize allowed (start === end)
- "All Clients" toggle (select all / deselect all)

Other Fixes:
- crypto.randomUUID fallback for non-secure contexts
- Chat message limit raised (200 max, client sends last 40)
- Status dropdown portal (no longer clipped by table overflow)
- Cents display restored in budget views (2 decimal places)
- Allocations grouped view with project sub-groups (collapsed by default)
- Server-side resource search for project wizard (no 500 limit)

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-16 15:31:48 +01:00
Hartmut a83edb2f9d feat: timeline UI overhaul with project/resource panel redesign, quick filters, and API improvements
Redesigned timeline project and resource panels with expanded detail views,
added quick filter toolbar, improved drag handling, and enhanced vacation/entitlement
router logic. Includes e2e test updates and minor API fixes.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:28:59 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00