Commit Graph

10 Commits

Author SHA1 Message Date
Hartmut 070be70848 refactor(application): extract vacation management into application use-cases
Moves approve, reject, cancel, and request vacation business logic
out of the tRPC procedure layer into packages/application, matching
the pattern used by allocation use-cases.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-09 17:11:37 +02:00
Hartmut 1d6d75ecf6 fix(api): wrap critical mutations in transactions and fix TOCTOU race conditions
- applyProjectScenario: wrap assignment loop in db.$transaction to prevent partial updates
- vacation approve/reject: fix TOCTOU race via updateMany with status-guard in WHERE + CONFLICT on count=0
- vacation cancel: wrap vacation.update + entitlement.updateMany in $transaction
- batchApprove: collect mutations, wrap in $transaction, dispatch SSE/notifications after commit
- Fix dead-code bug in createHappyPathDb where $transaction was assigned after return
- Add atomicity and concurrency tests

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-09 08:34:59 +02:00
Hartmut 4a49ec4f05 fix(sanity): resolve 15 gaps from sanity check audit (G-01 through G-15)
- G-01: ProjectWizard renders blueprint fieldDefs with DynamicFieldInput component
- G-02: Blueprint rolePresets validated via RolePresetsSchema in wizard; API keeps loose schema
- G-03: ProjectWizard step 2/3 validation (role, hoursPerDay, headcount required)
- G-04: EstimateWizard validates baseCurrency and demand line cost rates
- G-05: Project lifecycle transition guards with ALLOWED_TRANSITIONS map
- G-06: Blueprint validator extended for minLength/maxLength/pattern and DATE range checks
- G-07: assertBlueprintDynamicFields merges global blueprint fieldDefs into validation
- G-08: (tracked — chapter managed dropdown; deferred to backend ticket)
- G-09: JSDoc added to lcrCents/ucrCents clarifying LCR/UCR terminology
- G-10: Dispo route redirect already in place — closed as done
- G-11: packages/ui empty by design — closed as documented
- G-12: @deprecated JSDoc added to CreateAllocationSchema and UpdateAllocationSchema
- G-13: ProjectWizard review step enhanced with blueprint name, field values, skills, assignments
- G-14: ProjectWizard handleSubmit collects per-item warnings instead of silent swallowing
- G-15: Vacation cancel reverses usedDays entitlement for APPROVED ANNUAL/OTHER vacations

Tests: all 1575 passing (1 pre-existing failure in insights-summary unrelated to these changes)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-06 00:11:12 +02:00
Hartmut cb363ca5b3 feat(api): explain holiday-aware vacation deductions 2026-03-31 22:42:00 +02:00
Hartmut c7434c968e fix(vacation): scope preview requests to owned resources 2026-03-30 12:07:26 +02:00
Hartmut 819345acfa feat(platform): harden access scoping and delivery baseline 2026-03-30 00:27:31 +02:00
Hartmut 4f48afe7b4 feat(planning): ship holiday-aware planning and assistant upgrades 2026-03-28 22:49:28 +01:00
Hartmut cd78f72f33 chore: full technical rename planarchy → capakraken
Complete rename of all technical identifiers across the codebase:

Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports

Import statements: 277 files, 548 occurrences replaced

Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI

CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated

Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated

Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*

Documentation: 30+ .md files updated

Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-27 13:18:09 +01:00
Hartmut a83edb2f9d feat: timeline UI overhaul with project/resource panel redesign, quick filters, and API improvements
Redesigned timeline project and resource panels with expanded detail views,
added quick filter toolbar, improved drag handling, and enhanced vacation/entitlement
router logic. Includes e2e test updates and minor API fixes.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:28:59 +01:00
Hartmut 625a842d89 feat: dashboard overhaul, chargeability reports, dispo import enhancements, UI polish
Dashboard: expanded chargeability widget, resource/project table widgets
with sorting and filters, stat cards with formatMoney integration.

Chargeability: new report client with filtering, chargeability-bookings
use case, updated dashboard overview logic.

Dispo import: TBD project handling, parse-dispo-matrix improvements,
stage-dispo-projects resource value scores, new tests.

Estimates: CommercialTermsEditor component, commercial-terms engine
module, expanded estimate schemas and types.

UI: AppShell navigation updates, timeline filter/toolbar enhancements,
role management improvements, signin page redesign, Tailwind/globals
polish, SystemSettings SMTP section, anonymization support.

Tests: new router tests (anonymization, chargeability, effort-rule,
entitlement, estimate, experience-multiplier, notification, resource,
staffing, vacation).

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:29:07 +01:00