Commit Graph

3 Commits

Author SHA1 Message Date
Hartmut ddec3a927a feat: timeline multi-select, demand popover, resource hover card, merged tooltips, dark mode fixes
Major timeline enhancements:
- Right-click drag multi-selection with floating action bar (batch delete/assign)
- DemandPopover for demand strip details (replaces broken "Loading" modal)
- ResourceHoverCard on name hover showing skills, rates, role, chapter
- Merged heatmap+vacation tooltips into unified TimelineTooltip component
- Fixed overbooking blink animation (date normalization, z-index ordering)
- Fixed dark mode sticky column bleed-through in project view
- System roles admin page, notification task management, performance review docs

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-18 23:43:51 +01:00
Hartmut 093e13b88f feat: project cover art with AI generation, branding rename, RBAC fix, computation graph
- Add DALL-E cover art generation for projects (Azure OpenAI + standard OpenAI)
- CoverArtSection component with generate/upload/remove/focus-point controls
- Client-side image compression (10MB input → WebP/JPEG, max 1920px)
- DALL-E settings in admin panel (deployment, endpoint, API key)
- MCP assistant tools for cover art (generate_project_cover, remove_project_cover)
- Rename "Planarchy" → "plANARCHY" across all UI-facing text (13 files)
- Fix hardcoded canEdit={true} on project detail page — now checks user role
- Computation graph visualization (2D/3D) for calculation rules
- OG image and OpenGraph metadata

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-18 11:31:56 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00