Commit Graph

20 Commits

Author SHA1 Message Date
Hartmut e20bf64eef fix(web): portal timeline overlays above stacked panels 2026-03-30 13:18:08 +02:00
Hartmut 819345acfa feat(platform): harden access scoping and delivery baseline 2026-03-30 00:27:31 +02:00
Hartmut 47e4d701ff chore(repo): checkpoint current capakraken implementation state 2026-03-29 12:47:12 +02:00
Hartmut beae1a5d6e feat(assistant): add approval inbox and e2e hardening 2026-03-29 10:10:59 +02:00
Hartmut 4f48afe7b4 feat(planning): ship holiday-aware planning and assistant upgrades 2026-03-28 22:49:28 +01:00
Hartmut cd78f72f33 chore: full technical rename planarchy → capakraken
Complete rename of all technical identifiers across the codebase:

Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports

Import statements: 277 files, 548 occurrences replaced

Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI

CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated

Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated

Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*

Documentation: 30+ .md files updated

Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-27 13:18:09 +01:00
Hartmut ea02ca7106 fix: match Project View grid lines to Resource View
The Project View used its own buildProjectRowGridBackground() which
rendered CSS gradients with hardcoded rgba colors (no dark mode).
The Resource View used shared gridLines from useTimelineLayout which
renders React div elements with proper dark: Tailwind classes.

Fix: replaced the CSS gradient approach with the shared gridLines
in both resource rows and open demand rows within the Project View.
Removed the now-unused buildProjectRowGridBackground function (~40 LOC).

Both views now use identical grid lines with:
- Brand-colored today marker
- Amber weekend highlights
- Proper dark mode colors via Tailwind classes

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-24 11:46:43 +01:00
Hartmut 3c0befb7db feat: enhanced timeline hover tooltip with role, dates, status
The tooltip shown when hovering over project strips in the timeline
now includes additional information:
- Role name (e.g. "3D Artist", "Project Manager")
- Assignment date range (2026-03-01 → 2026-06-30)
- Status badge when not CONFIRMED (shows PROPOSED, DRAFT, etc.)
- Lead person and order type on the same line

Data comes from already-loaded timeline entries — no extra API calls.
Safe change: tooltip is pointer-events-none and read-only.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-23 07:30:08 +01:00
Hartmut da984da470 fix: timeline filter dropdown z-index — add z-0 to scroll container
The scroll container's relative positioning created a stacking context
that rendered its children (z-30 sticky labels) above the toolbar's
dropdown (z-[60]). Adding z-0 to the scroll container explicitly places
it below the toolbar's z-20 stacking context, allowing dropdowns to
render on top.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-22 19:10:24 +01:00
Hartmut 7a57b5e649 fix: timeline filter dropdown rendered behind scroll container
Add relative z-20 to TimelineToolbar so ProjectCombobox and
ResourceCombobox dropdowns (z-[60]) render above the scroll
container below. The scroll container's relative positioning
was creating a stacking context that overlapped the dropdowns.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-22 18:55:18 +01:00
Hartmut c02f453679 fix: hover card, preferences modal, timeline scroll, multi-drag
- ResourceHoverCard: add isInitialLoading to useEffect deps so
  mouseover/mouseout listeners attach after canvas mounts
- PreferencesModal: lift prefsOpen state to AppShell, render modal
  outside sidebar's backdrop-blur stacking context
- Timeline page: constrain to max-h-[100dvh] overflow-hidden so
  horizontal scrollbar is accessible without scrolling to bottom
- Multi-drag: pass selectedAllocationIds from ref at drag completion
  to prevent stale closure in onMultiDragComplete callback

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 20:30:43 +01:00
Hartmut a97597093f feat: Sprint 2 — data storytelling and visual richness
Timeline project color system:
- 16-color deterministic palette (same project = same color always)
- Resource panel: allocation blocks colored by project instead of uniform green
- Project panel: colored left border + dot on project headers
- ProjectColorLegend: floating strip showing color-to-project mapping
- Utilization intensity tint: subtle background gradient on resource rows

Table visual enhancements:
- Resources: inline 3px utilization bar below chargeability percentage
- Resources: 32px avatar circles with initials + role-derived colors
- Projects: animated budget bars, styled resource count badges
- Allocations: 3px left border colored by status (green/amber/blue/gray/red)

KPI progress rings:
- Budget utilization: ProgressRing wrapping AnimatedNumber on dashboard
- Chargeability report: ring on average chargeability summary card
- Resource detail: rings on chargeability target + actual metrics
- Vacation balance: ring showing remaining days with color thresholds
- Demand widget: mini rings on FTE fill rate per project
- Resource detail: FadeIn on SkillRadarChart

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 00:58:06 +01:00
Hartmut e7b74f13bd refactor: consolidate duplicated code across web and API packages
- Extract shared render helpers (vacation blocks, range overlay, overbooking blink) into renderHelpers.tsx
- Centralize status badge styles and vacation color maps into status-styles.ts
- Extract dragMath.ts utility from useTimelineDrag for reuse
- Split useInvalidatePlanningViews into useInvalidateTimeline (4 queries) + useInvalidatePlanningViews (8 queries)
- Adopt findUniqueOrThrow() and Prisma select constants across API routers
- Add shared fmtEur() helper for API-side money formatting
- Wrap TimelineResourcePanel and TimelineProjectPanel with React.memo
- Fix pre-existing TS2589 deep type errors in TeamCalendar and VacationModal
- 38 files changed, reducing ~400 lines of duplicated code

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-19 00:10:08 +01:00
Hartmut ddec3a927a feat: timeline multi-select, demand popover, resource hover card, merged tooltips, dark mode fixes
Major timeline enhancements:
- Right-click drag multi-selection with floating action bar (batch delete/assign)
- DemandPopover for demand strip details (replaces broken "Loading" modal)
- ResourceHoverCard on name hover showing skills, rates, role, chapter
- Merged heatmap+vacation tooltips into unified TimelineTooltip component
- Fixed overbooking blink animation (date normalization, z-index ordering)
- Fixed dark mode sticky column bleed-through in project view
- System roles admin page, notification task management, performance review docs

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-18 23:43:51 +01:00
Hartmut eb283147d1 feat: project colors, timeline filters, sidebar fix, GitLooper agent, and misc improvements
- Fix sidebar double-highlight on /vacations/my (Gitea #6): add isNavItemActive() helper
- Add project color picker (schema + API + modal + timeline rendering)
- Add ProjectCombobox/ResourceCombobox to timeline toolbar
- Show PENDING vacations on timeline with dashed/dimmed style
- Add "show demand projects" preference with localStorage persistence
- Add ProjectAssignmentsTable with total hours/cost columns
- Extend vacation API to accept status arrays
- Add GitLooper formal YAML agent configuration
- Extend user admin with permission overrides UI
- Add delete-assignment use case tests
- Add status-styles.ts shared badge constants
- Centralize formatMoney/formatCents in format.ts

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-17 10:22:52 +01:00
Hartmut b0e55786c3 feat: AI assistant (HartBOT), demand filling, budget-per-role, project favorites, and UX improvements
AI Assistant (HartBOT):
- Chat panel with inline layout, session persistence, message history (up-arrow recall)
- OpenAI function calling with 20+ tools (search, navigate, create/cancel allocations, update status)
- RBAC-aware tool filtering, fuzzy search with word-level matching
- Navigation actions (router.push) and data invalidation after mutations
- Country/metro city/org unit/role filtering on resource search

Demand Filling Enhancements:
- Two-phase fill modal: plan multiple resources, then confirm & assign all at once
- Availability preview per resource (available/partial/conflict days, existing bookings)
- Coverage bar showing demand hours distribution across assigned resources
- Fill demand from project detail page (new Assign button per demand)
- Fixed: filled demands no longer shown on timeline, demand bars no longer overlap

Budget per Role:
- DemandRequirement.budgetCents field (schema + API + UI)
- Project wizard step 3: budget input per role with allocation summary bar
- Project detail: allocated vs booked budget per demand
- Fill demand modal: role budget display with cost estimates
- AllocationModal: budget field for demand editing

Project Favorites:
- User.favoriteProjectIds (JSONB) with toggle API
- Star button on projects list and detail page (optimistic updates)
- "My Projects" dashboard widget (favorites + responsible person projects)

Project Management:
- Edit project from detail page (ProjectModal integration)
- Edit demands from detail page (AllocationModal integration)
- Admin-only project deletion (cascades assignments + demands)
- Create user accounts from admin panel

Timeline Fixes:
- Country multi-select filter with backend support
- URL param sync for same-page navigation (AI assistant integration)
- Demand lane stacking (no more overlapping bars)
- Single-day booking resize handles (always visible, min 6px)
- Single-day resize allowed (start === end)
- "All Clients" toggle (select all / deselect all)

Other Fixes:
- crypto.randomUUID fallback for non-secure contexts
- Chat message limit raised (200 max, client sends last 40)
- Status dropdown portal (no longer clipped by table overflow)
- Cents display restored in budget views (2 decimal places)
- Allocations grouped view with project sub-groups (collapsed by default)
- Server-side resource search for project wizard (no 500 limit)

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-16 15:31:48 +01:00
Hartmut a83edb2f9d feat: timeline UI overhaul with project/resource panel redesign, quick filters, and API improvements
Redesigned timeline project and resource panels with expanded detail views,
added quick filter toolbar, improved drag handling, and enhanced vacation/entitlement
router logic. Includes e2e test updates and minor API fixes.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-15 09:28:59 +01:00
Hartmut 625a842d89 feat: dashboard overhaul, chargeability reports, dispo import enhancements, UI polish
Dashboard: expanded chargeability widget, resource/project table widgets
with sorting and filters, stat cards with formatMoney integration.

Chargeability: new report client with filtering, chargeability-bookings
use case, updated dashboard overview logic.

Dispo import: TBD project handling, parse-dispo-matrix improvements,
stage-dispo-projects resource value scores, new tests.

Estimates: CommercialTermsEditor component, commercial-terms engine
module, expanded estimate schemas and types.

UI: AppShell navigation updates, timeline filter/toolbar enhancements,
role management improvements, signin page redesign, Tailwind/globals
polish, SystemSettings SMTP section, anonymization support.

Tests: new router tests (anonymization, chargeability, effort-rule,
entitlement, estimate, experience-multiplier, notification, resource,
staffing, vacation).

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:29:07 +01:00
Hartmut ad0855902b refactor: complete v2 refactoring plan (Phases 1-5)
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.

Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.

Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).

Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.

Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.

All tests pass: 209 API, 254 engine, 67 application.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-03-14 23:03:42 +01:00
Hartmut dd55d0e78b chore(repo): initialize planarchy workspace 2026-03-14 14:31:09 +01:00