Hartmut
f0bea6235d
fix(web): reuse project combobox in timeline popovers
2026-03-30 13:34:59 +02:00
Hartmut
cd78f72f33
chore: full technical rename planarchy → capakraken
...
Complete rename of all technical identifiers across the codebase:
Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports
Import statements: 277 files, 548 occurrences replaced
Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI
CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated
Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated
Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*
Documentation: 30+ .md files updated
Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-27 13:18:09 +01:00
Hartmut
e1368c7ef7
feat: Sprint 4 — scenario planner, report builder, comments, dashboard widgets
...
What-If Scenario Planner (G5):
- New /projects/[id]/scenario page with side-by-side baseline vs scenario
- simulate mutation: pure cost/hours/headcount/utilization computation
- apply mutation: creates real PROPOSED assignments from scenario
- Impact cards: cost delta, hours delta, headcount, skill coverage %
- Per-resource utilization impact table with over-allocation warnings
- "What-If" button added to project detail page
Custom Report Builder (G7):
- New /reports/builder page with full config panel
- Entity selector (resource/project/assignment), column picker, filter builder
- Dynamic Prisma query with eq/neq/gt/lt/contains/in operators
- Sortable results table with pagination (50/page)
- CSV export via exportReport mutation
- Sidebar nav link under Analytics
Collaboration Layer (G8):
- Comment model in Prisma (entityType/entityId, replies, @mentions, resolved)
- comment router: list, count, create, resolve, delete
- @mention parsing with notification creation + SSE delivery
- CommentInput with @mention autocomplete (arrow nav, Enter/Tab confirm)
- CommentThread with avatar, timestamp, reply, resolve, delete
- Integrated as "Comments" tab in estimate workspace with count badge
Dashboard Widgets:
- BudgetForecastWidget: progress bars per project, burn rate, exhaustion date
- SkillGapWidget: supply vs demand per skill, shortage/surplus indicators
- ProjectHealthWidget: 3-dimension health circles + composite score
- 3 new application use-cases + dashboard router queries
- All registered in widget-registry with lazy imports
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-19 21:47:47 +01:00
Hartmut
5ffc0d92e4
perf: lazy-load xlsx/recharts, split estimate tabs, memoize nav
...
- xlsx dynamically imported via cached singleton in excel.ts and
skillMatrixParser.ts (removes ~100 kB from 4 routes)
- recharts extracted into lazy-loaded SkillDistributionChart and
PeakTimesChart components (removes ~60 kB from 3 routes)
- EstimateWorkspaceClient: 7 tab components + 2 editors loaded via
next/dynamic (reduces /estimates/[id] from 323 kB to 138 kB)
- ImportModal lazy-loaded in ResourcesClient (deferred until open)
- NavItem memoized with React.memo, top 5 routes get prefetch=true
- Raw <img> replaced with next/image in ProjectsClient, CoverArtSection
- tRPC QueryClient: refetchOnWindowFocus/Reconnect disabled globally
Heaviest routes reduced 39-66% First Load JS:
/analytics/skills: 383→132 kB (-66%)
/estimates/[id]: 323→138 kB (-57%)
/resources/[id]: 458→210 kB (-54%)
/estimates: 310→170 kB (-45%)
/resources: 363→222 kB (-39%)
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-19 01:23:33 +01:00
Hartmut
ddec3a927a
feat: timeline multi-select, demand popover, resource hover card, merged tooltips, dark mode fixes
...
Major timeline enhancements:
- Right-click drag multi-selection with floating action bar (batch delete/assign)
- DemandPopover for demand strip details (replaces broken "Loading" modal)
- ResourceHoverCard on name hover showing skills, rates, role, chapter
- Merged heatmap+vacation tooltips into unified TimelineTooltip component
- Fixed overbooking blink animation (date normalization, z-index ordering)
- Fixed dark mode sticky column bleed-through in project view
- System roles admin page, notification task management, performance review docs
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-18 23:43:51 +01:00
Hartmut
093e13b88f
feat: project cover art with AI generation, branding rename, RBAC fix, computation graph
...
- Add DALL-E cover art generation for projects (Azure OpenAI + standard OpenAI)
- CoverArtSection component with generate/upload/remove/focus-point controls
- Client-side image compression (10MB input → WebP/JPEG, max 1920px)
- DALL-E settings in admin panel (deployment, endpoint, API key)
- MCP assistant tools for cover art (generate_project_cover, remove_project_cover)
- Rename "Planarchy" → "plANARCHY" across all UI-facing text (13 files)
- Fix hardcoded canEdit={true} on project detail page — now checks user role
- Computation graph visualization (2D/3D) for calculation rules
- OG image and OpenGraph metadata
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-18 11:31:56 +01:00
Hartmut
ad0855902b
refactor: complete v2 refactoring plan (Phases 1-5)
...
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.
Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.
Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).
Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.
Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.
All tests pass: 209 API, 254 engine, 67 application.
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-14 23:03:42 +01:00
Hartmut
dd55d0e78b
chore(repo): initialize planarchy workspace
2026-03-14 14:31:09 +01:00