Hartmut
b41c1d2501
rename(phase 1): CapaKraken → Nexus across code, UI, docs, CI ( #61 )
...
CI / Architecture Guardrails (push) Successful in 2m38s
CI / Assistant Split Regression (push) Successful in 3m33s
CI / Typecheck (push) Successful in 3m51s
CI / Lint (push) Successful in 5m2s
CI / E2E Tests (push) Has been cancelled
CI / Fresh-Linux Docker Deploy (push) Has been cancelled
CI / Release Images (push) Has been cancelled
CI / Build (push) Has been cancelled
CI / Unit Tests (push) Has been cancelled
rename(phase 1): CapaKraken → Nexus across code, UI, docs, CI (#61 )
Co-authored-by: Hartmut Nörenberg <hn@hartmut-noerenberg.com >
Co-committed-by: Hartmut Nörenberg <hn@hartmut-noerenberg.com >
2026-05-21 16:28:40 +02:00
Hartmut and claude-flow
cd78f72f33
chore: full technical rename planarchy → capakraken
...
Complete rename of all technical identifiers across the codebase:
Package names (11 packages):
- @planarchy/* → @capakraken/* in all package.json, tsconfig, imports
Import statements: 277 files, 548 occurrences replaced
Database & Docker:
- PostgreSQL user/db: planarchy → capakraken
- Docker volumes: planarchy_pgdata → capakraken_pgdata
- Connection strings updated in docker-compose, .env, CI
CI/CD:
- GitHub Actions workflow: all filter commands updated
- Test database credentials updated
Infrastructure:
- Redis channel: planarchy:sse → capakraken:sse
- Logger service name: planarchy-api → capakraken-api
- Anonymization seed updated
- Start/stop/restart scripts updated
Test data:
- Seed emails: @planarchy.dev → @capakraken.dev
- E2E test credentials: all 11 spec files updated
- Email defaults: @planarchy.app → @capakraken.app
- localStorage keys: planarchy_* → capakraken_*
Documentation: 30+ .md files updated
Verification:
- pnpm install: workspace resolution works
- TypeScript: only pre-existing TS2589 (no new errors)
- Engine: 310/310 tests pass
- Staffing: 37/37 tests pass
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-27 13:18:09 +01:00
Hartmut and claude-flow
e5d7ca1293
refactor: rename Planarchy to CapaKraken (branding only)
...
User-facing rename across 20 files:
- Layout title/meta: "CapaKraken — Resource & Capacity Planning"
- Sidebar logo: "CapaKraken" with "RESOURCE & CAPACITY PLANNING"
- Sign-in page: "CapaKraken Control Center", "Sign in to CapaKraken"
- PWA manifest: name + short_name
- PDF reports: footer text
- Install prompt: "Install CapaKraken"
- AI assistant system prompt
- Webhooks test payload
- Email subject lines
- Tooltips, descriptions, empty states
NOT changed (technical identifiers):
- Package names (@planarchy/*)
- Import paths
- Database names
- Docker container names
- localStorage keys
- Domain URLs
- CLAUDE.md
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-25 21:46:15 +01:00
Hartmut and claude-flow
ddec3a927a
feat: timeline multi-select, demand popover, resource hover card, merged tooltips, dark mode fixes
...
Major timeline enhancements:
- Right-click drag multi-selection with floating action bar (batch delete/assign)
- DemandPopover for demand strip details (replaces broken "Loading" modal)
- ResourceHoverCard on name hover showing skills, rates, role, chapter
- Merged heatmap+vacation tooltips into unified TimelineTooltip component
- Fixed overbooking blink animation (date normalization, z-index ordering)
- Fixed dark mode sticky column bleed-through in project view
- System roles admin page, notification task management, performance review docs
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-18 23:43:51 +01:00
Hartmut and claude-flow
093e13b88f
feat: project cover art with AI generation, branding rename, RBAC fix, computation graph
...
- Add DALL-E cover art generation for projects (Azure OpenAI + standard OpenAI)
- CoverArtSection component with generate/upload/remove/focus-point controls
- Client-side image compression (10MB input → WebP/JPEG, max 1920px)
- DALL-E settings in admin panel (deployment, endpoint, API key)
- MCP assistant tools for cover art (generate_project_cover, remove_project_cover)
- Rename "Planarchy" → "plANARCHY" across all UI-facing text (13 files)
- Fix hardcoded canEdit={true} on project detail page — now checks user role
- Computation graph visualization (2D/3D) for calculation rules
- OG image and OpenGraph metadata
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-18 11:31:56 +01:00
Hartmut and claude-flow
625a842d89
feat: dashboard overhaul, chargeability reports, dispo import enhancements, UI polish
...
Dashboard: expanded chargeability widget, resource/project table widgets
with sorting and filters, stat cards with formatMoney integration.
Chargeability: new report client with filtering, chargeability-bookings
use case, updated dashboard overview logic.
Dispo import: TBD project handling, parse-dispo-matrix improvements,
stage-dispo-projects resource value scores, new tests.
Estimates: CommercialTermsEditor component, commercial-terms engine
module, expanded estimate schemas and types.
UI: AppShell navigation updates, timeline filter/toolbar enhancements,
role management improvements, signin page redesign, Tailwind/globals
polish, SystemSettings SMTP section, anonymization support.
Tests: new router tests (anonymization, chargeability, effort-rule,
entitlement, estimate, experience-multiplier, notification, resource,
staffing, vacation).
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-14 23:29:07 +01:00
Hartmut and claude-flow
ad0855902b
refactor: complete v2 refactoring plan (Phases 1-5)
...
Phase 1 — Quick Wins: centralize formatMoney/formatCents, extract
findUniqueOrThrow helper (19 routers), shared Prisma select constants,
useInvalidatePlanningViews hook, status badge consolidation, composite
DB indexes.
Phase 2 — Timeline Split: extract TimelineContext, TimelineResourcePanel,
TimelineProjectPanel; split 28-dep useMemo into 3 focused memos.
TimelineView.tsx reduced from 1,903 to 538 lines.
Phase 3 — Query Performance: server-side filtering for getEntriesView,
remove availability from timeline resource select, SSE event debouncing
(50ms batch window).
Phase 4 — Estimate Workspace: extract 7 tab components and 3 editor
components. EstimateWorkspaceClient 1,298→306 lines,
EstimateWorkspaceDraftEditor 1,205→581 lines.
Phase 5 — Package Cleanup: split commit-dispo-import-batch (1,112→573
lines), extract shared pagination helper with 11 tests.
All tests pass: 209 API, 254 engine, 67 application.
Co-Authored-By: claude-flow <ruv@ruv.net >
2026-03-14 23:03:42 +01:00
Hartmut
dd55d0e78b
chore(repo): initialize planarchy workspace
2026-03-14 14:31:09 +01:00