# Dispo Import Implementation
|
|
|
|
**Date:** 2026-03-14
|
|
**Purpose:** Canonical implementation document for replacing the current Planarchy planning dataset with a clean-slate import from the Dispo v2 Excel workbooks.
|
|
|
|
## Scope
|
|
|
|
This document defines how Planarchy should ingest and normalize the following source workbooks:
|
|
|
|
- `/samples/Dispov2/MandatoryDispoCategories_V3.xlsx`
|
|
- `/samples/Dispov2/DISPO_2026.xlsx`
|
|
- `/samples/Dispov2/20260309_Bi-Weekly_Chargeability_Reporting_Content_Production_V0.943_4Hartmut.xlsx`
|
|
- `/samples/Dispov2/MV_DispoRoster.xlsx`
|
|
- `/samples/Dispov2/Resource Roster_MASTER_FY26_CJ_20251201.xlsx`
|
|
|
|
The goal is not a raw workbook archive. The goal is a normalized Planarchy dataset that:
|
|
|
|
- wipes existing database data and starts from a clean baseline
|
|
- imports canonical reference data first
|
|
- stages operational Dispo data before commit
|
|
- creates real projects, assignments, vacations, availability rules, and reporting inputs
|
|
- does not create fake bookings for unassigned time
|
|
- handles public holidays through the vacation planner
|
|
|
|
## Agreed Business Rules
|
|
|
|
These rules are fixed unless superseded by a later decision record:
|
|
|
|
- There is only one canonical person identifier. `EID` and `Enterprise ID` are the same source identity.
|
|
- Existing database data should be wiped completely before the new import.
|
|
- `[BMW]` is the client token.
|
|
- `[11035763]` is the stable WBS/project key.
|
|
- `{CH80}` means utilization category `CH` and `winProbability = 80`.
|
|
- `_HB` and `_SB` suffixes can be ignored.
|
|
- `TBD` means unassigned time. It must not create a fake project or fake booking.
|
|
- `[tbd]` means unresolved project identity and should remain staged until resolved.
|
|
- `2D` and `3D` map to chapter `Digital Content Production`.
|
|
- `PM` maps to chapter `Project Management`.
|
|
- `AD` maps to chapter `Art Direction`.
|
|
- People booked on projects need the corresponding project role assigned on the booking.
|
|
- Internal work categories should be mapped as normalized internal project/utilization buckets.
|
|
- Public holidays should be modeled properly in the vacation planner.
|
|
- Project start and end dates should be inferred from earliest and latest imported assignment dates.
|
|
- Assignment granularity should normalize 50% to 4 hours and 100% to 8 hours.
|
|
- Part-time import must reduce weekday availability on the days the person is not available.
|
|
|
|
## Source Workbook Roles
|
|
|
|
### 1. `MandatoryDispoCategories_V3.xlsx`
|
|
|
|
Use as the source of:
|
|
|
|
- reference/master-data vocabulary
|
|
- client and project attribute glossary
|
|
- calendar and SAH rules
|
|
- validation guidance for resource attributes
|
|
|
|
Do not treat it as the primary source of transactional planning rows.
|
|
|
|
### 2. `DISPO_2026.xlsx`
|
|
|
|
Use as the primary source of:
|
|
|
|
- operational planning matrix
|
|
- project bookings
|
|
- internal work bookings
|
|
- absences
|
|
- public-holiday source hints
|
|
- part-time hints
|
|
- unassigned capacity
|
|
|
|
This workbook requires a parser. It is not directly importable as row-based CRUD input.
|
|
|
|
### 3. `Bi-Weekly Chargeability Reporting...xlsx`
|
|
|
|
Use as the source of:
|
|
|
|
- target and forecast reconciliation
|
|
- resource enrichment when missing elsewhere
|
|
- aggregate validation after commit
|
|
|
|
Do not treat PTD/MTD/YTD outputs as canonical source-of-truth records when Planarchy can derive them from normalized data.
|
|
|
|
### 4. `MV_DispoRoster.xlsx`
|
|
|
|
Use as the source of:
|
|
|
|
- operational resource master rows keyed by `EID`
|
|
- `SAP_data` enrichment for real display names and email addresses
|
|
- chapter, department, client-unit, FTE, and activity-window enrichment
|
|
- pseudo-demand row filtering before any resource commit
|
|
|
|
Do not import `Demand_*` rows as real resources.
|
|
|
|
## Verified Source Constraint
|
|
|
|
The workbook set now includes both a row-based resource master source and a cost-rate source.
|
|
|
|
What is actually present:
|
|
|
|
- `MandatoryDispoCategories_V3.xlsx` `EID-Attr` is a glossary/reference sheet
|
|
- `Bi-Weekly Chargeability Reporting...xlsx` provides roster identity, FTE, management group, chapter, metro city, and client unit
|
|
- `MV_DispoRoster.xlsx` `DispoRoster` provides operational roster rows and `SAP_data` provides real email/display-name coverage for many resources
|
|
- `Resource Roster_MASTER_FY26_CJ_20251201.xlsx` provides per-person `LCR` / `UCR` rows plus management-level averages for fallback resolution
|
|
- `DISPO_2026.xlsx` provides transactional planning, vacation, holiday, and part-time signals
|
|
|
|
Implementation consequence:
|
|
|
|
- staging can be completed from the current workbook set
|
|
- strict source-data blockers are cleared for the supplied workbook set
|
|
- resources missing a source email are imported with fallback email `<EID>@accenture.com`
|
|
- `demand_*` planning identities are ignored during staging and readiness checks
|
|
- unresolved `[tbd]` project rows still remain staged by design and must not be auto-committed as final projects
|
|
|
|
## Current Implementation Status
|
|
|
|
Implemented in the application layer:
|
|
|
|
- reference workbook parser and stager
|
|
- chargeability parser and stager
|
|
- planning parser and stager
|
|
- project resolution staging
|
|
- roster parser and stager with `DispoRoster` + `SAP_data` merge logic
|
|
- cost-rate parser and roster-rate merge logic with exact and management-level fallback resolution
|
|
- readiness assessment over merged resource sources
|
|
- batch staging orchestration across all current workbook inputs
|
|
|
|
Remaining import blocker for a strict production-grade commit:
|
|
|
|
- unresolved `[tbd]` project references that are intentionally kept out of final project commit
|
|
|
|
## Target Domain Model
|
|
|
|
The import commits into the existing planning model:
|
|
|
|
- `Country`
|
|
- `MetroCity`
|
|
- `OrgUnit`
|
|
- `UtilizationCategory`
|
|
- `Client`
|
|
- `ManagementLevelGroup`
|
|
- `ManagementLevel`
|
|
- `Role`
|
|
- `Resource`
|
|
- `ResourceRole`
|
|
- `Project`
|
|
- `DemandRequirement`
|
|
- `Assignment`
|
|
- `Vacation`
|
|
- `VacationEntitlement`
|
|
|
|
Relevant current schema anchors:
|
|
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L178)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L235)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L334)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L372)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L460)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L754)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L780)
|
|
- [schema.prisma](/home/hartmut/Documents/Copilot/planarchy/packages/db/prisma/schema.prisma#L815)
|
|
|
|
## Required Implementation Changes
|
|
|
|
### 1. Canonical Person Identity
|
|
|
|
Planarchy currently stores both `eid` and `enterpriseId` on `Resource`. The import should operate on a single canonical identity.
|
|
|
|
Recommendation:
|
|
|
|
- choose `enterpriseId` as the canonical external person key
|
|
- keep `eid` synchronized to the same value during transition, or remove its operational significance in the import path
|
|
- reject imports that produce conflicting person rows for the same canonical identity
|
|
|
|
This avoids duplicate matching logic throughout staging and commit.
|
|
|
|
### 2. Staging Layer
|
|
|
|
Add dedicated staging tables or equivalent durable import records. The staging layer is required.
|
|
|
|
Recommended staging entities:
|
|
|
|
- `ImportBatch`
|
|
- `StagedResource`
|
|
- `StagedClient`
|
|
- `StagedProject`
|
|
- `StagedAssignment`
|
|
- `StagedVacation`
|
|
- `StagedAvailabilityRule`
|
|
- `StagedUnresolvedRecord`
|
|
|
|
Each staged record should retain:
|
|
|
|
- source workbook name
|
|
- sheet name
|
|
- row number
|
|
- original raw value
|
|
- normalized parsed fields
|
|
- parser warnings
|
|
- resolution status
|
|
|
|
The staging layer is the review boundary between workbook parsing and final commit.
|
|
|
|
### 3. Clean-Slate Reset
|
|
|
|
Before final import, wipe the existing database contents.
|
|
|
|
Recommended reset scope:
|
|
|
|
- business data
|
|
- auth/session data
|
|
- derived snapshots
|
|
- previous import artifacts
|
|
|
|
After reset, reseed immediately:
|
|
|
|
- admin user
|
|
- access roles and permissions required to sign in
|
|
- essential platform defaults
|
|
- import reference seed data only when not supplied from the workbooks
|
|
|
|
Implementation note:
|
|
|
|
- take a full backup before reset
|
|
- make the reset command idempotent in non-production development environments
|
|
- require an explicit force flag in scripts
|
|
|
|
## Two-Step Import Flow
|
|
|
|
### Step A. Stage
|
|
|
|
### Goals
|
|
|
|
- parse all source files
|
|
- normalize tokens
|
|
- build deterministic staging rows
|
|
- surface conflicts before any planning data is committed
|
|
|
|
### Responsibilities
|
|
|
|
1. ingest workbook files
|
|
2. parse reference/master data
|
|
3. parse planning matrix cells into typed staging records
|
|
4. detect conflicts and unresolved cases
|
|
5. generate a review report
|
|
|
|
### Stage Output
|
|
|
|
- staged resources
|
|
- staged roles
|
|
- staged chapters/org mapping
|
|
- staged clients
|
|
- staged projects
|
|
- staged assignments
|
|
- staged vacations/public holidays
|
|
- staged part-time availability rules
|
|
- unresolved `[tbd]` project references
|
|
- unresolved identity conflicts
|
|
|
|
### Step B. Commit
|
|
|
|
### Goals
|
|
|
|
- write only validated data
|
|
- preserve traceability to staging
|
|
- block unresolved project identities
|
|
|
|
### Responsibilities
|
|
|
|
1. create reference data
|
|
2. create resources and roles
|
|
3. create projects and internal buckets
|
|
4. create assignments
|
|
5. create vacations/public holidays
|
|
6. apply availability overrides
|
|
7. run reconciliation against chargeability workbook aggregates
|
|
|
|
### Commit Rules
|
|
|
|
- unresolved `[tbd]` project rows must not silently create final projects
|
|
- unassigned time must not create assignments
|
|
- weekend markers must not create vacation rows
|
|
- all project bookings must resolve to a role and utilization category
|
|
- all resources must resolve to a canonical person ID
|
|
|
|
## Field Mapping
|
|
|
|
### Reference Data Mapping
|
|
|
|
| Source | Field/Token | Target | Notes |
|
|
| ---------------------------------- | ------------------------ | --------------------------------------------------------------------- | -------------------------------------------- |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `Country/Territory` | `Country` | source for country master data and SAH rules |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `Metro City` | `MetroCity` | child of country |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `Chapter` / org labels | `OrgUnit` and `Resource.chapter` | normalize level mapping during stage |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `Management Level Group` | `ManagementLevelGroup` | includes target percentage reference |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `Management Level` | `ManagementLevel` | child of management level group |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `WBS Master Client` | `Client` parent | master client node |
|
|
| `MandatoryDispoCategories_V3.xlsx` | `WBS Client Name` | `Client` child | legal/sub-client node |
|
|
| `MandatoryDispoCategories_V3.xlsx` | SAH rules | `Country.dailyWorkingHours`, schedule logic, holiday generation rules | not all rules map 1:1 yet |
|
|
|
|
### Resource Mapping
|
|
|
|
| Source | Field | Target | Notes |
|
|
| ----------------------------------------- | ------------------------- | ----------------------------------------------------- | ------------------------------------------------------ |
|
|
| `EID-Attr`, `ChgFC`, `Dispo` row metadata | `Enterprise ID` / `EID` | canonical resource key | one identity only |
|
|
| `ChgFC` | `FTE` | `Resource.fte` | baseline contract capacity |
|
|
| `ChgFC` | `Management Level Group` | `Resource.managementLevelGroupId` | reference lookup |
|
|
| `EID-Attr` | `Management Level` | `Resource.managementLevelId` | reference lookup |
|
|
| `ChgFC` | `Metro City` | `Resource.metroCityId` | resolve via master data |
|
|
| `EID-Attr` | `Country/Territory` | `Resource.countryId` | resolve via master data |
|
|
| `ChgFC` | `MV Org Unit 1 / Chapter` | `Resource.chapter` / `Resource.orgUnitId` | normalize by agreed mapping |
|
|
| `EID-Attr` | `Unit (Client Unit)` | `Resource.clientUnitId` | lookup to client tree if modeled there |
|
|
| `EID-Attr` | `Ressource Type` | `Resource.resourceType` | enum mapping required |
|
|
| `EID-Attr` | `LCR` | `Resource.lcrCents` | normalize currency to cents |
|
|
| `EID-Attr` | `UCR` | `Resource.ucrCents` | normalize currency to cents |
|
|
| `ChgFC` | `Target (per Level)` | `Resource.chargeabilityTarget` or group target source | use management group target as primary when consistent |
|
|
|
|
Rate resolution during staging:
|
|
|
|
- `Resource Roster_MASTER_FY26_CJ_20251201.xlsx` is the primary cost-rate source.
|
|
- Exact `EID`/enterprise matches populate `lcrCents` and `ucrCents` directly.
|
|
- If a person is missing in the cost workbook, the importer falls back to same-management-level averages from that workbook.
|
|
- Only resources with neither an exact row nor a usable management-level fallback remain readiness blockers for LCR/UCR.
|
|
|
|
### Chapter and Role Mapping
|
|
|
|
Resource chapter mapping:
|
|
|
|
| Token | Resource chapter |
|
|
| ----- | ---------------------------- |
|
|
| `2D` | `Digital Content Production` |
|
|
| `3D` | `Digital Content Production` |
|
|
| `PM` | `Project Management` |
|
|
| `AD` | `Art Direction` |
|
|
|
|
Assignment role mapping:
|
|
|
|
| Token | Assignment role |
|
|
| ----- | ----------------- |
|
|
| `2D` | `2D Artist` |
|
|
| `3D` | `3D Artist` |
|
|
| `PM` | `Project Manager` |
|
|
| `AD` | `Art Director` |
|
|
|
|
Implementation guidance:
|
|
|
|
- chapter is a resource-organizational dimension
|
|
- role is an assignment-level delivery dimension
|
|
- assign both when both are known
|
|
|
|
### Project Mapping
|
|
|
|
| Source token | Target | Notes |
|
|
| ------------------------ | -------------------------------------------------------------- | ------------------------------------------ |
|
|
| `[BMW]` | `Project.clientId` | resolve to client |
|
|
| `[11035763]` | stable WBS key | recommended source for `Project.shortCode` |
|
|
| `{CH80}` | `Project.utilizationCategoryId`, `Project.winProbability = 80` | parser splits prefix and numeric suffix |
|
|
| project text body | `Project.name` | cleaned of helper suffixes |
|
|
| earliest assignment date | `Project.startDate` | inferred |
|
|
| latest assignment date | `Project.endDate` | inferred |
|
|
| `[tbd]` | unresolved staged project | do not auto-commit as final project |
|
|
|
|
### Utilization and Planning Token Mapping
|
|
|
|
| Token family | Meaning | Commit target |
|
|
| ------------ | ---------------------------------- | --------------------------------------------------------------------- |
|
|
| `CH` | chargeable client work | project assignment |
|
|
| `MO` | management and operations | internal project/bucket assignment |
|
|
| `MD` | market development / initiative | internal project/bucket assignment |
|
|
| `PD` | personal development / recruitment | internal project/bucket assignment |
|
|
| `AB` | absence | vacation row |
|
|
| `NA` | non-bookable / calendar state | usually availability or derived calendar rule, not project assignment |
|
|
| `UN` | unassigned | no assignment commit |
|
|
|
|
### Assignment Mapping
|
|
|
|
Assignments should be written only when a project or internal bucket is resolved.
|
|
|
|
| Source | Target | Notes |
|
|
| --------------------- | --------------------------------------- | --------------------------------------------------------- |
|
|
| project booking cell | `Assignment` | resource, project, role, start/end, hours/day, percentage |
|
|
| internal `MO` cell | `Assignment` to internal project/bucket | utilization category `M&O` |
|
|
| internal `MD` cell | `Assignment` to internal project/bucket | utilization category `MD&I` |
|
|
| internal `PD` cell | `Assignment` to internal project/bucket | utilization category `PD&R` |
|
|
| `[_UN] unassign {UN}` | no final assignment | capacity remains free |
|
|
|
|
### Vacation and Holiday Mapping
|
|
|
|
| Source token | Target | Notes |
|
|
| ------------------------------- | ------------------------------- | -------------------------------------------------------- |
|
|
| `[_AB] ... {AB}` | `Vacation` | approved absence row |
|
|
| `[_NA] Public Holiday ... {NA}` | `Vacation(type=PUBLIC_HOLIDAY)` | preferred source of truth is geography-driven generation |
|
|
| `[_NA] Weekend {NA}` | no vacation row | derive from calendar |
|
|
|
|
Public holiday implementation should integrate with the existing vacation planner and batch holiday support in [vacation.ts](/home/hartmut/Documents/Copilot/planarchy/packages/api/src/router/vacation.ts#L425).
|
|
|
|
### Availability and Part-Time Mapping
|
|
|
|
Part-time markers must alter resource availability instead of creating fake bookings.
|
|
|
|
Rules:
|
|
|
|
- `100%` maps to 8 available hours on a standard full working day
|
|
- `50%` maps to 4 available hours on a standard full working day
|
|
- part-time markers should reduce weekday availability on non-working or reduced-working days
|
|
|
|
Recommended commit target:
|
|
|
|
- `Resource.fte` remains the contractual baseline
|
|
- `Resource.availability` stores actual weekday available hours
|
|
|
|
Examples:
|
|
|
|
- 75% with one day fully off per week:
|
|
- availability sets one weekday to `0`
|
|
- 80% with reduced time across five weekdays:
|
|
- availability distributes reduced hours across weekdays
|
|
|
|
If the workbook does not encode the weekday pattern explicitly:
|
|
|
|
- stage the record as `availabilityPattern = unresolved`
|
|
- commit only the `fte`
|
|
- require manual review before applying weekday reductions
|
|
|
|
## Parser Design
|
|
|
|
The `DISPO_2026.xlsx` parser should operate at calendar-slot level and emit normalized staging records.
|
|
|
|
### Parser Inputs
|
|
|
|
- workbook name
|
|
- sheet name
|
|
- row identity
|
|
- day/column identity
|
|
- source token text
|
|
- resource roster metadata from the row
|
|
|
|
### Parser Outputs
|
|
|
|
- normalized booking type
|
|
- resource canonical ID
|
|
- date
|
|
- slot fraction
|
|
- hours per day
|
|
- percentage
|
|
- client token
|
|
- WBS
|
|
- utilization category
|
|
- win probability
|
|
- role token
|
|
- chapter token
|
|
- ignore flags
|
|
- unresolved reason when parsing fails
|
|
|
|
### Token Normalization Rules
|
|
|
|
1. strip ignored suffixes like `_HB`, `_SB`
|
|
2. extract client from `[CLIENT]`
|
|
3. extract WBS from `[12345678]` when numeric
|
|
4. extract unresolved project marker from `[tbd]`
|
|
5. extract utilization and win probability from `{CH80}`
|
|
6. extract role prefix from leading `2D`, `3D`, `PM`, `AD`
|
|
7. classify special bracket tokens `[_AB]`, `[_NA]`, `[_UN]`, `[_MO]`, `[_MD]`, `[_PD]`
|
|
|
|
## Internal Project Strategy
|
|
|
|
Internal work should not be left as free text.
|
|
|
|
Recommendation:
|
|
|
|
- seed canonical internal projects or internal planning buckets for:
|
|
- `M&O`
|
|
- `MD&I`
|
|
- `PD&R`
|
|
- assign them consistent utilization categories
|
|
- keep source token text in assignment metadata for traceability
|
|
|
|
This allows planning, reporting, and chargeability to remain normalized.
|
|
|
|
## `[tbd]` Resolution Strategy
|
|
|
|
`[tbd]` is not a valid final project identity.
|
|
|
|
Recommended behavior:
|
|
|
|
- stage as unresolved project demand
|
|
- do not auto-create final project rows during commit
|
|
- allow reviewer resolution by:
|
|
- matching to existing WBS
|
|
- creating a new real project
|
|
- converting the row into intentional unassigned capacity
|
|
- converting the row into a `DemandRequirement` when a role need is known but no confirmed project exists
|
|
|
|
This is the only area where a manual review gate is required by default.
|
|
|
|
## Public Holiday Strategy
|
|
|
|
Public holidays should be driven by geography and stored in the vacation planner.
|
|
|
|
Recommended approach:
|
|
|
|
1. resolve each resource to country and, where relevant, metro city/federal state
|
|
2. generate public holidays for the applicable calendar year
|
|
3. commit them as approved `Vacation(type=PUBLIC_HOLIDAY)` rows
|
|
4. reconcile workbook holiday markers against generated rows
|
|
|
|
Known implementation gap:
|
|
|
|
- the chargeability forecast currently passes an empty `publicHolidays` list into SAH calculation in [chargeability-report.ts](/home/hartmut/Documents/Copilot/planarchy/packages/api/src/router/chargeability-report.ts#L167)
|
|
|
|
Required follow-up:
|
|
|
|
- make forecast logic consume public-holiday vacation rows or geography-derived holiday dates
|
|
|
|
## Reconciliation and Acceptance Checks
|
|
|
|
After commit, run reconciliation against the chargeability workbook.
|
|
|
|
Required checks:
|
|
|
|
- resource count matches expected staged resource count
|
|
- FTE totals by org unit match workbook aggregates within tolerance
|
|
- chargeability targets by management group match expected values
|
|
- project/client/WBS relationships are complete for all committed assignments
|
|
- unassigned capacity is visible only as free capacity, not as fake bookings
|
|
- vacations and public holidays are visible in the vacation planner
|
|
- part-time resources show reduced weekday availability where resolved
|
|
|
|
## Suggested Implementation Order
|
|
|
|
1. add import staging schema and storage
|
|
2. add full reset + reseed command
|
|
3. add reference-data importer for `MandatoryDispoCategories_V3.xlsx`
|
|
4. add canonical resource importer and identity normalization
|
|
5. add role and chapter normalization
|
|
6. add `DISPO_2026.xlsx` parser
|
|
7. add staged project resolver for WBS and `[tbd]`
|
|
8. add assignment commit flow
|
|
9. add vacation and public-holiday import flow
|
|
10. add part-time availability overlay logic
|
|
11. add reconciliation report against `ChgFC` and aggregate sheets
|
|
12. add rollback/replay support for repeated dry runs
|
|
|
|
## Operator Commands
|
|
|
|
For the clean-slate import workflow, use dedicated DB scripts instead of ad-hoc SQL:
|
|
|
|
- reset and bootstrap a disposable environment:
|
|
- `pnpm --filter @planarchy/db db:reset:dispo -- --force`
|
|
- reset without `pg_dump` backup only in an intentionally disposable environment:
|
|
- `pnpm --filter @planarchy/db db:reset:dispo -- --force --skip-backup`
|
|
- seed Dispo v2 reference vocabulary after reset:
|
|
- `pnpm --filter @planarchy/db db:seed:dispo-v2`
|
|
|
|
The reset command:
|
|
|
|
- backs up the database with `pg_dump` by default
|
|
- truncates all public tables except Prisma migration history
|
|
- recreates a bootstrap admin user and baseline `SystemSettings`
|
|
- leaves workbook-derived reference and transactional data to the import pipeline
|
|
|
|
## Decision Log
|
|
|
|
The following decisions are locked for implementation and should be treated as the canonical baseline for all downstream tickets.
|
|
|
|
### D1. Canonical Resource Identity
|
|
|
|
- `enterpriseId` is the canonical external person key for all staged and committed import logic.
|
|
- `eid` remains in the schema as a compatibility alias during the transition period.
|
|
- the importer must mirror the canonical identity into both `enterpriseId` and `eid` on committed `Resource` rows unless a later cleanup ticket removes `eid`
|
|
- conflicting source rows for the same canonical identity must remain staged and unresolved
|
|
|
|
### D2. Reset And Bootstrap Scope
|
|
|
|
- the clean-slate reset wipes business data, auth/session data, notifications, audit logs, estimate data, and previous import artifacts
|
|
- the reset must reseed a bootstrap admin user, baseline platform permissions, and required singleton settings immediately after wipe
|
|
- imported workbook data is not the source of truth for platform access bootstrapping
|
|
- reset remains an explicit operator action with backup-first workflow
|
|
|
|
### D3. `[tbd]` Commit Policy
|
|
|
|
- `[tbd]` rows never auto-create final `Project` rows
|
|
- `[tbd]` rows remain staged and unresolved by default
|
|
- a reviewer may explicitly resolve a `[tbd]` row into:
|
|
- an existing real project
|
|
- a newly created real project
|
|
- intentional unassigned capacity
|
|
- a `DemandRequirement`
|
|
- automatic commit logic must skip unresolved `[tbd]` rows
|
|
|
|
### D4. Default Part-Time Fallback
|
|
|
|
- when the workbook encodes an explicit weekday pattern, the importer must commit that exact reduced availability pattern
|
|
- when only an FTE/percentage is known, the importer should distribute the reduced weekly capacity evenly across Monday to Friday
|
|
- any such fallback must be marked with a staging warning so operators can refine the weekday pattern later
|
|
- examples:
|
|
- `100%` => `8/8/8/8/8`
|
|
- `50%` => `4/4/4/4/4`
|
|
- `80%` => `6.4/6.4/6.4/6.4/6.4`
|
|
|
|
### D5. Internal Project Buckets
|
|
|
|
Seed canonical internal planning projects/buckets as follows:
|
|
|
|
| Source token | Project short code | Project name | Utilization category |
|
|
| ------------ | ------------------ | ---------------------------------- | -------------------- |
|
|
| `MO` | `INT-MO` | `Management & Operations` | `M&O` |
|
|
| `MD` | `INT-MD` | `Market Development & Initiatives` | `MD&I` |
|
|
| `PD` | `INT-PD` | `People Development & Recruitment` | `PD&R` |
|
|
|
|
The importer should preserve the original source token in staged and committed metadata for traceability.
|
|
|
|
### D6. Seeded Role Vocabulary
|
|
|
|
The baseline role seed list required for Dispo import is:
|
|
|
|
- `2D Artist`
|
|
- `3D Artist`
|
|
- `Project Manager`
|
|
- `Art Director`
|
|
|
|
These roles are assignment-level delivery roles. They do not replace chapter/org ownership on the resource profile.
|
|
|
|
## Recommendation
|
|
|
|
Proceed with a staged importer and treat this document as the implementation baseline.
|
|
|
|
The critical architectural choices are:
|
|
|
|
- clean-slate reset
|
|
- canonical single-ID resource matching
|
|
- staged parsing before commit
|
|
- no fake unassigned bookings
|
|
- explicit assignment roles separate from resource chapters
|
|
- geography-driven public holidays in the vacation planner
|
|
- manual resolution gate only for `[tbd]` and unresolved availability patterns
|